St. Louis Park – Idaho and Hampshire Avenues S.


Scheduled Start Date: September 20, 2021

CNP Map of SLP 16th St W and Hampshire Ave S.png


Project Resources

  • If you contact CenterPoint Energy for any questions, please reference the project’s name or number 98772721.


What will CenterPoint Energy do?

Beginning in mid-September and lasting into October or November 2021, CenterPoint Energy’s authorized contractors will work in St. Louis Park along the following roads:

  • Hampshire Avenue S. from Cedar Lake Road to 1360 Hampshire Avenue S.
  • Idaho Avenue S. from 16th to 22nd Streets W.
  • 18th Street W. from Hampshire to Georgia Avenues S.
  • The cul-de-sac of 16th Street W. east of Hampshire Avenue S.

While NPL will replace natural gas mains, connect the natural gas service lines to the new mains, and move any inside residential meters outside, Q3 Contracting will restore the areas affected by NPL’s work. During this time, lane and parking closures may occur. For a limited time, the crews will close Idaho Avenue S. in front of 1840 and 1837 Idaho Avenue S. During this time, the crews will help residents maintain local access. Through traffic will be detoured to 18th Street W., Jersey Avenue S., and 22nd Street W.


What is CenterPoint Energy’s COVID-19 protocol?

The construction crews and personnel will continue to use the Covid-19 Customer Permission Flyer, which requests customer permission prior to entering homes. Personnel, contractors and CenterPoint Energy employees will continue to practice CDC guidelines regarding social distancing, sanitary practices and wearing face masks when entering customer homes.


What if I have an inside gas meter?

The customer will receive a CenterPoint Energy postcard in the mail typically within one or two weeks prior to the day when the Michels Corporation crews will perform the work. The crews will have CenterPoint Energy-authorized photo IDs stating that they are employees of Michels Corporation.

After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment with them.

Customers are advised to set aside a two- to four-hour time frame for the inside-to-outside gas meter move. They are also advised to mark their privately-installed utilities such as dog fences or sprinklers. Marking can be accomplished with tools such as spray paint or utility flags. The foreman will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated.

Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains. Areas affected by our work will be restored to their original condition.


What should I expect during restoration?

 On the soft surfaces such as boulevards and lawns, various erosion control measures keep the restored area moist, hold seed in the soil, and enhance seed germination. If an erosion blanket is needed it is secured in place with staples. The mesh is a wood fiber that will completely degrade. Prior to mowing the restored area, remove any loose staples that secured the blanket. For photo examples, please visit our Restoration Practices page.