Plymouth – Evergreen Lane N.


Scheduled Start Date: June 27, 2022

CNP Map of Plymouth Evergreen Ln.png


Project Resources

  • If you contact CenterPoint Energy for any questions, please reference the project’s name or number 97547711.


What will CenterPoint Energy do?

From Monday, June 27 into July 2022, CenterPoint Energy’s authorized contractor, Q3 Contracting, will work in Plymouth along Evergreen Lane N. from 18th Avenue N. to Medicine Lake Drive W. While the crew will replace natural gas mains, connect the natural gas service lines to the new mains, move any inside residential meters outside, and restore the areas affected by their work.

When the crews close Medicine Lake Drive W. on the south end of the project, detour signs will lead drivers to Highway 55, 26th Avenue N. and 18th Avenue N. Pedestrian and bicycle traffic will be detoured to the opposite side of Medicine Lake Drive W. While the crews are working on Evergreen Lane N., they will close the road to through traffic. Since closures will alternate, our website will be updated. Access to Luce Line Trail will be maintained at all times.


What is CenterPoint Energy’s COVID-19 protocol?

The construction crews and personnel will continue to use the Covid-19 Customer Permission Flyer, which requests customer permission prior to entering homes. Personnel, contractors and CenterPoint Energy employees will continue to practice CDC guidelines regarding social distancing, sanitary practices and wearing face masks when entering customer homes.


What if I have an inside gas meter?

The customer will receive a CenterPoint Energy postcard in the mail typically within one or two weeks prior to the day when the crews will perform the work. The crews will have CenterPoint Energy-authorized photo IDs stating that they are employees of Q3 Contracting.

After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment.

Customers are advised to set aside a two- to four-hour time frame for the inside-to-outside gas meter move. They are also advised to mark their privately-installed utilities such as dog fences or sprinklers. Marking can be accomplished with tools such as spray paint or utility flags.

The foreman will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated. Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains.


What should I expect during restoration?

On the soft surfaces such as boulevards and lawns, various erosion control measures keep the restored area moist, hold seed in the soil, and enhance seed germination. If an erosion blanket is needed it is secured in place with staples. The mesh is a wood fiber that will completely degrade. Prior to mowing the restored area, remove any loose staples that secured the blanket. For photo examples, please visit our Restoration Practices page.