We’ve detected a problem with your browser settings. It’s possible that you don't have javascript enabled in your browser. Please enable javascript in your browser settings to successfully view our site.
The browser you are using is out of date and will soon be unsupported. Please update to the latest version or view our site in another browser.
Sign In | Register
Call us at 800-245-2377Residential
612-321-4939Business
Send us a message
See all contact info
Sign in now to get access to your CenterPoint Energy online services to pay your bill, manage communication preferences and more!
Don't have an online access? Register today
Service Area : Minnesota Change
To serve you better please select from the list of service areas below to see relevant CenterPoint Energy information.
State
Region
Starting Monday 10/20, Noble Ave will be closed from Cty Rd 66/Golden Valley Rd east to Spruce Trail. Follow detour signs that start at W 36th Ave and head north to HWY 100. There will be access to local residents within the closure to their homes.
Restoration of sidewalk work and a road cut will be completed next week. Trying to have the TC removed 9/19/25. There will need to be a lane shift the following week for final restoration with black dirt and seed with the sidewalk work. That will be up one day the week of 9/22. Both the east and west bound lane should be open the week of 9/22.
East bound lane is closed between Lawn Terrace and Xenia Ave S. Crews are working in front of Meadowbrook school and will be completed with the gas installations this week. The main entrance to the school is accessible on Xenia and those exiting the school can turn west on Glenwood Ave. Ideally restoration will be completed next week, and we have have the traffic set up taken down by 9/19.
A small section of natural gas main will be installed on the south side of Duluth Street at the intersection of Adair Avenue North. This work requires a closure of the southernmost eastbound lane of Duluth Street.
Installation of modern natural gas main is beginning today in Golden Valley. Work for the first few weeks will take place north of Duluth Street, in the east boulevard of Adair Avenue North, the north boulevard of Kenneth Way and west boulevard of Brunswick Avenue North.
During this time, parking will be restricted on either side of the roads with active construction work. One sidewalk will be closed while the other remains accessible.
Construction in Golden Valley will begin in early April. Updates on the crews' location, next steps and relevant information will be posted here on a regular basis.
Before construction begins, an authorized contractor will be in the area to locate sewer lines in relation to natural gas lines. This is an important safety measure CenterPoint is required to take. It is possible a technician performing this work will need to access your home to locate sewer lines. Ask to see CenterPoint Energy identification before letting anyone in your home.