Minneapolis - Phillips South


Scheduled Start Date: Late June 2021

CNP Map of Mpls South Phillips.png


Project Resources

  • If you contact CenterPoint Energy for any questions, please reference the project’s name or number 95731292 or 96759428 (for steel main replacement on 27th Street E.).


What will CenterPoint Energy do?

From late June to within fall 2021, CenterPoint Energy’s authorized contractors will work in Minneapolis. Michels Corporation will replace natural gas mains, connect the natural gas service lines to the new mains, and move any inside residential meters outside. Q3 Contracting will restore the areas affected by Michels Corporation’s work outside the limit of the City of Minneapolis’s Phillips South, Powderhorn & 35th St. E. Resurfacing. During this time, lane or parking closures may occur along the following streets:

  • 26th Street E. between 5th Avenue S. and Chicago Avenue S.
  • 27th Street E. between 5th Avenue S. and Chicago Avenue S.
  • 28th Street E. between 5th Avenue S. and Chicago Avenue S.
  • Columbus Avenue S. at 25th Street E. and from 26th Street E. to Lake Street E.
  • Oakland Avenue S. from just north of 26th Street E. to 28th Street E. and on the 2900 block
  • 5th Avenue S. between 27th Street E. and Lake Street E.
  • The 2900 blocks of Clinton Avenue S. and 3rd Avenue S.


What is CenterPoint Energy’s COVID-19 protocol?

The construction crews and personnel will continue to use the Covid-19 Customer Permission Flyer, which requests customer permission prior to entering homes. Personnel, contractors and CenterPoint Energy employees will continue to practice CDC guidelines regarding social distancing, sanitary practices and wearing face masks when entering customer homes.


What if I have an inside gas meter?

The customer will receive a CenterPoint Energy postcard in the mail typically within one or two weeks prior to the day when the Michels Corporation crews will perform the work. The crews will have CenterPoint Energy-authorized photo IDs stating that they are employees of Michels Corporation. After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment.

Customers are advised to set aside a two- to four-hour time frame for the inside-to-outside gas meter move. They are also advised to mark their privately-installed utilities such as dog fences or sprinklers. Marking can be accomplished with tools such as spray paint or utility flags.

The foreman will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated. Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains.


What should I expect during restoration?

Crews from Q3 Contracting, CenterPoint Energy’s authorized contractor, will follow to restore the areas affected by Michels Corporation’s work, including hard and soft surfaces. On the soft surfaces such as boulevards and lawns, various erosion control measures keep the restored area moist, hold seed in the soil, and enhance seed germination. If an erosion blanket is needed it is secured in place with staples. The mesh is a wood fiber that will completely degrade. Prior to mowing the restored area, remove any loose staples that secured the blanket.