Minneapolis – Main Street NE and 2nd Street NE


Scheduled Start Date: November 18, 2021

CNP Map of Mpls Main St NE 2021.png


Project Resources

  • If you contact CenterPoint Energy for any questions, please reference the project’s name or number 100371425.


What will CenterPoint Energy do?

Occurring this November and December, pausing in winter, and resuming in spring 2022, CenterPoint Energy’s authorized contractors will work in Minneapolis along the following streets:

  • Main Street NE from 35th to 37th Avenues NE
  • 2nd Street NE from Edge Place to just north of 36th Avenue NE
  • 35th Avenue NE from Main Street NE to 2nd Street NE

While Michels Corporation will replace the natural gas mains, connect the natural gas service lines to the new mains, and move any inside residential meters outside, Q3 Contracting will restore the areas affected by Michels Corporation’s work.

This November and December, Michels Corporation will replace the gas mains. In spring, they will return to connect the service lines to the new mains. In areas of active construction, parking, lane, and sidewalk closures may occur. Main Street NE will be closed to through traffic between 35th and 37th Avenues NE while the crews are working there.

This season, Q3 Contracting will put down winter erosion control on the areas affected by Michels Corporation’s work. The hard surfaces will have temporary asphalt, including those that were previously concrete. In spring 2022, the crews will restore them to their original condition. On any excavations in boulevards and lawns, they will backfill with dirt and place netting over these areas. In spring 2022, they will return with black dirt and seed.

For photo examples, please visit our Restoration Practices page. 



What is CenterPoint Energy’s COVID-19 protocol?

The construction crews and personnel will continue to use the Covid-19 Customer Permission Flyer, which requests customer permission prior to entering homes. Personnel, contractors and CenterPoint Energy employees will continue to practice CDC guidelines regarding social distancing, sanitary practices and wearing face masks when entering customer homes.


What if I have an inside gas meter?

The customer will receive a CenterPoint Energy postcard in the mail typically within one or two weeks prior to the day when the Michels Corporation crews will perform the work. The crews will have CenterPoint Energy-authorized photo IDs stating that they are employees of Michels Corporation.

After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment.

Customers are advised to set aside a two- to four-hour time frame for the inside-to-outside gas meter move. They are also advised to mark their privately-installed utilities such as dog fences or sprinklers. Marking can be accomplished with tools such as spray paint or utility flags.

The foreman will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated. Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains.


What should I expect during restoration?

On the soft surfaces such as boulevards and lawns, various erosion control measures keep the restored area moist, hold seed in the soil, and enhance seed germination. If an erosion blanket is needed it is secured in place with staples. The mesh is a wood fiber that will completely degrade. Prior to mowing the restored area, remove any loose staples that secured the blanket.