Minneapolis – Linden Hills Neighborhood


Anticipated timeline: several weeks starting Monday, April 10

  • If you contact CenterPoint Energy, please reference the work order number 105031564.

CNP Map of Mpls Linden Hills.png
 

Overview

For several weeks starting Monday, April 10, CenterPoint Energy’s authorized contractors will work in the Linden Hills Neighborhood in Minneapolis on France Avenue S. from Excelsior Boulevard to 44th Street W. 

Equix Integrity will update our records on the locations of sewer lines in relation to natural gas lines. Michels Corporation will replace a natural gas main, move inside meters to the outside of homes, and replace or reconnect service lines as needed. Q3 Contracting will restore the areas affected by the natural gas contractor’s work. There will be no assessment or cost associated with our work.


Marking utilities

CenterPoint Energy will contact Gopher State One Call 811 to locate public underground utilities such as water, sewer, and cable. You will see markings such as spray paint and utility flags. They will be color-coordinated to indicate a separate utility.

If you have installed any private lines such as sprinklers or dog fences, we ask that you mark them with whatever material is convenient for you. Examples include spray paint, flags, and wooden sticks used to stir paint. Marking sprinkler heads is sufficient.


Small-diameter natural gas plastic main work

In the week of April 10, one crew will replace the small-diameter natural gas main at Glendale Terrace and France Avenue S. They will connect the service lines to this new main and move inside meters outside by appointment.

In the weeks of April 10, 17, and 24, another crew will follow to work on the service lines and meters on France Avenue S. from Excelsior Boulevard to 44th Street W. They will begin at Excelsior Boulevard, working south toward 44th Street W.


Service line and meter work

The customer will receive a CenterPoint Energy postcard in the mail explaining the project before the natural gas crews perform the work. The crews will have CenterPoint Energy-authorized photo IDs. After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment with them.

One natural gas crew typically works on about one block per week. They will either fully replace the service line or reconnect it to the new main, depending on the line’s age. For most properties, the crews remove at least one sidewalk panel in front of the house, excavate a hole by the outside meter, and bore the service line from the sidewalk to the house.

For inside meters, the crew will make a two- to three-hour appointment at a time that works with the resident. We encourage customers to work with the crew on where they want the meter to go, keeping limitations in mind such as a minimum of three feet away from areas such as windows, doors, and vents. Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains.

The technician will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated.


Restoration

After the service line and meter work, the gas crew will backfill the excavated areas with dirt or gravel. This will be temporary before the restoration crew comes. On boulevards and lawns, they will refill the areas with black dirt, grass seed, and netting that degrades over about four months. Prior to mowing the restored area, remove any loose staples that secured the netting. For photo examples, please visit our Restoration Practices page


We hope to minimize the disruption as much as possible. Thank you in advance for your patience and understanding as we replace our infrastructure. We wish you a great season.