We’ve detected a problem with your browser settings. It’s possible that you don't have javascript enabled in your browser. Please enable javascript in your browser settings to successfully view our site.
The browser you are using is out of date and will soon be unsupported. Please update to the latest version or view our site in another browser.
Sign In | Register
Call us at 800-245-2377Residential
612-321-4939Business
Send us a message
See all contact info
Sign in now to get access to your CenterPoint Energy online services to pay your bill, manage communication preferences and more!
Don't have an online access? Register today
Service Area : Minnesota Change
To serve you better please select from the list of service areas below to see relevant CenterPoint Energy information.
State
Region
In the week of July 21st, a crew from Michels, CenterPoint Energy’s authorized contractor, plans to continue replacing the natural gas main under the south road of Franklin Ave E between Park Ave S and Chicago Ave S. They anticipate that the main replacement on this road will take approximately 4 weeks. During this time, parking will be restricted on both sides of Franklin Ave E. Traffic will be reduced to 1 lane each direction. Lane shifts/lane reductions/limited parking can be expected along Park Ave S, Columbus Ave S, & Chicago Ave S as well.
July 11th to July 13th Portland Ave S will be reduced to one lane at the intersection of Franklin Ave E.
July 16th to July 20th the east parking lane of Portland Ave S north of Franklin Ave E will be closed with likely lane reductions on Portland Ave as well.
Installation of modern gas main along Franklin Avenue began today, June 9, and is expected to last about two weeks. Construction will take place on the east sides of 24th and 25th Avenue South at their intersections with East Franklin Avenue.
North bound traffic will be restricted with detours in place. The east sidewalk of both 24th and 25th Avenue South will be closed. Street parking within the active work zone will be restricted. Resident access will be maintained throughout construction.
The crew will move east, towards East Franklin Avenue and Seabury Avenue, following the completion of construction at the mentioned intersections.
For several weeks beginning as early as June 9, 2025, CenterPoint Energy will replace natural gas infrastructure along Franklin Avenue. Updates regarding the utility crew's location, traffic impacts and other details will be posted here regularly.
Before construction begins, an authorized contractor will be in the area to locate sewer lines in relation to natural gas lines. This is an important safety measure CenterPoint is required to take. It is possible a technician performing this work will need to access your home to locate sewer lines. Ask to see CenterPoint Energy identification before letting anyone in your home.