Project Description

Beginning in the week of May 31 and lasting into summer 2021, CenterPoint Energy’s authorized contractors will work in Minneapolis along the following streets: 25th Ave. N. between Irving and Dupont Avenues N.; Aldrich Ave. N. & 25th Ave. N.; and Irving, Humboldt, Girard and Aldrich Avenues N. between 25th and 26th Avenues N. While Michels Corporation will replace two natural gas mains, connect the natural gas service lines to the first of the new mains, and move any inside residential meters outside, Q3 Contracting will restore the areas affected by Michels Corporation’s work.

Traffic Impacts

Full closures of the affected roads will occur for approx. two blocks at a time. Detour routes will lead through traffic to the next block or two over. Sidewalk closures will alternate as needed to maintain pedestrian access. Parking will be restricted on both sides of the road within the closures. The crews will work with residents on maintaining access.