We’ve detected a problem with your browser settings. It’s possible that you don't have javascript enabled in your browser. Please enable javascript in your browser settings to successfully view our site.
The browser you are using is out of date and will soon be unsupported. Please update to the latest version or view our site in another browser.
Sign In | Register
Call us at 800-245-2377Residential
612-321-4939Business
Send us a message
See all contact info
Sign in now to get access to your CenterPoint Energy online services to pay your bill, manage communication preferences and more!
Don't have an online access? Register today
Service Area : Minnesota Change
To serve you better please select from the list of service areas below to see relevant CenterPoint Energy information.
State
Region
For most of the project’s duration, two-way traffic will be maintained with lane shifts. Flaggers may be placed on Highway 316 at Maher Avenue and Tuttle Drive to help direct traffic. Parking will be restricted on both sides of 31st Street E. Sidewalk closures will alternate in areas of active construction.
For a limited time, the crews will close Maher Avenue on either side of Highway 316. During this time, Maher Avenue will be open to local residents only. Through traffic will be redirected. Douglas Drive, 37th Street W. and Highway 316 will remain open during the Maher Avenue closure.
From April 26 to late May or early June 2021, CenterPoint Energy’s authorized contractors will work in Hastings along Highway 316 (Red Wing Boulevard) at Spiral Boulevard, 31st Street W., Maher Avenue and Tuttle Drive. While Michels Corporation will replace the natural gas main, connect the natural gas service lines to the new main, and move any inside residential meters outside, Q3 Contracting will restore the areas affected by Michels Corporation’s work.