Traffic Impacts

During this time, lane or road closures may occur. More details will be added closer to the project’s start date.

Project Description

From April to June 2021, CenterPoint Energy’s authorized contractors will work in Edina along Blake Road from South Knoll Drive to Lake Ridge Road. This project will happen in four phases:


Phase 1:

Michels Corporation will replace the first of the project’s two natural gas mains. This main is a distribution main that will feed the natural gas service lines to homes and businesses. This phase will happen from South Knoll Drive to Pine Grove Road.


Phase 2:

Michels Corporation will connect the service lines to the distribution main. This phase will happen from South Knoll Drive to Pine Grove Road.


Phase 3:

CenterPoint Energy’s authorized contractor will replace the second main. This main is a transmission main that will feed the distribution main. This phase will happen from Lake Ridge Road to South Knoll Drive.


Phase 4:

Q3 Contracting will restore the areas affected by work on the natural gas lines outside the limits of the City of Edina’s Mill and Overlay project.