​Eden Prairie - Neill Lake Road and Basswood Road Neighborhood


Scheduled Start Date: 2021 construction season

CNP Map of Eden Prairie - Neill Lake Road.png


This 2021 construction season, CenterPoint Energy’s authorized contractors will work in Eden Prairie along the following streets north and south of Anderson Lakes Parkway: Basswood Road, Deer Path, Black Maple Circle, Bentwood Drive, Neill Lake Road, Forestview Circle, Woodwatch Circle, Lake Fall Drive, Flyway Circle, and Fox Run Circle.

While Michels Corporation will replace the natural gas main, connect the natural gas service lines to the new main, and move any inside residential meters outside, Q3 Contracting will restore the areas affected by Michels Corporation’s work. During this time, lane or parking closures may occur.

More details will be added closer to the project’s start date.