Chaska – 2nd Street E.


Scheduled Start Date: Week of October 18, 2021

CNP Map of Chaska 2nd St E.png

Project Resources

  • If you contact CenterPoint Energy for any questions, please reference the project’s name or number 97102050.

What will CenterPoint Energy do?

From the week of October 18 into late fall 2021, CenterPoint Energy’s authorized contractors will work along the following streets: 

  • 2nd Street E. between Walnut and Maple Streets N.
  • Walnut, Oak, and Ash Streets N. between 1st and 3rd Streets E.
  • Maple Street N. between 2nd and 3rd Streets E. 

While Michels Corporation will replace the natural gas mains, connect the natural gas service lines to the new mains, and move any inside residential meters outside, Q3 Contracting will restore the areas affected by Michels Corporation’s work. 

To prepare for this work, CenterPoint Energy will request Gopher State One Call to locate underground public utilities. After Labor Day, residents will notice utility flags and spray paint markings in and near areas where the natural gas line replacements will happen.

In 2022, further work will be performed west of Walnut Street S. More information will be provided closer to that portion of the project. 

What is CenterPoint Energy’s COVID-19 protocol?

The construction crews and personnel will continue to use the Covid-19 Customer Permission Flyer, which requests customer permission prior to entering homes. Personnel, contractors and CenterPoint Energy employees will continue to practice CDC guidelines regarding social distancing, sanitary practices and wearing face masks when entering customer homes.

What if I have an inside gas meter?

The customer will receive a CenterPoint Energy postcard in the mail typically within one or two weeks prior to the day when the Michels Corporation crews will perform the work. The crews will have CenterPoint Energy-authorized photo IDs stating that they are employees of Michels Corporation.

After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment with them.

Customers are advised to set aside a two- to four-hour time frame for the inside-to-outside gas meter move. They are also advised to mark their privately-installed utilities such as dog fences or sprinklers. Marking can be accomplished with tools such as spray paint or utility flags. The foreman will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated.

Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains. Areas affected by our work will be restored to their original condition.


What should I expect during restoration?

On the soft surfaces such as boulevards and lawns, various erosion control measures keep the restored area moist, hold seed in the soil, and enhance seed germination. If an erosion blanket is needed it is secured in place with staples. The mesh is a wood fiber that will completely degrade. Prior to mowing the restored area, remove any loose staples that secured the blanket. For photo examples, please visit our Restoration Practices page.