11/23/2021

In the weeks of November 22 and 29, a crew from Michels Corporation, CenterPoint Energy’s authorized contractor, will connect the natural gas service lines to the new mains north of 90th Street W. Work will be suspended from Thursday, November 25 to Sunday, November 28 for the holiday weekend.


A crew from Q3 Contracting, CenterPoint Energy’s authorized contractor, will put down winter erosion control on the areas affected by construction. The hard surfaces will have temporary asphalt, including those that were previously concrete. In spring 2022, the crews will restore them to their original condition. On any excavations in boulevards and lawns, they will backfill with dirt and place netting over these areas. In spring 2022, they will return with black dirt and seed.

11/15/2021

Crews from Michels Corporation, CenterPoint Energy’s authorized contractor, have replaced the project’s natural gas mains. Another crew has been connecting the project’s service lines to the new mains. They worked on Logan, Morgan and Knox Avenues S. Currently, they’re working on Newton Avenue S. at 90th Street W.


A crew from Q3 Contracting, CenterPoint Energy’s authorized contractor, will follow to restore the areas affected by Michels Corporation’s work. On any excavations in boulevards and lawns, they will backfill with dirt and place netting over these areas. In spring 2022, they will return with black dirt and seed.


We appreciate your patience as we upgrade our natural gas lines, ensuring system reliability for years to come.

What will CenterPoint Energy do?

Beginning in mid-September and lasting into fall 2021, CenterPoint Energy’s authorized contractors will work in Bloomington along the following roads: Oliver Avenue S. from 91st to 92nd Streets W.; Newton Avenue S. from 89th to 90th Streets W. and from 91st to 92nd Streets W.; Morgan Avenue S. from 89th to 92nd Streets W.; Logan Avenue S. from 86th to 89th Streets W. and from 91st to 92nd Streets W.; Knox Avenues S. from Logan Avenue S. to 89th Street W. and from 91st to 92nd Streets W.; 89th Street W. from Penn to Knox Avenues S.; 91st Street W. from Oliver to Logan Avenues S.; 91st ½ Street W. from Penn to Oliver Avenues S.; and 92nd Street W. from Oliver to James Avenues S.


While Michels Corporation will replace natural gas mains, connect the natural gas service lines to the new mains, and move any inside residential meters outside, Q3 Contracting will restore the areas affected by Michels Corporation’s work. For most of the project’s duration, lane and parking closures will occur. Some full closures will occur at 92nd St. W. and James Ave. and at 91st St. W. and Knox Ave.

What is CenterPoint Energy’s COVID-19 protocol?

The construction crews and personnel will continue to use the Covid-19 Customer Permission Flyer, which requests customer permission prior to entering homes. Personnel, contractors and CenterPoint Energy employees will continue to practice CDC guidelines regarding social distancing, sanitary practices and wearing face masks when entering customer homes.

What if I have an inside gas meter?

The customer will receive a CenterPoint Energy postcard in the mail typically within one or two weeks prior to the day when the Michels Corporation crews will perform the work. The crews will have CenterPoint Energy-authorized photo IDs stating that they are employees of Michels Corporation.


After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrives, he will leave a door tag with his contact information to schedule an appointment with him.


Customers are advised to set aside a two- to four-hour time frame for the inside-to-outside gas meter move. They are also advised to mark their privately-installed utilities such as dog fences or sprinklers. Marking can be accomplished with tools such as spray paint or utility flags. The foreman will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated.


Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains. Areas affected by our work will be restored to their original condition.

What should I expect during restoration?

Crews from Q3 Contracting, CenterPoint Energy’s authorized contractor, will follow to restore the areas affected by Michels Corporation’s work, including hard and soft surfaces. On the soft surfaces such as boulevards and lawns, various erosion control measures keep the restored area moist, hold seed in the soil, and enhance seed germination. If an erosion blanket is needed it is secured in place with staples. The mesh is a wood fiber that will completely degrade. Prior to mowing the restored area, remove any loose staples that secured the blanket.