What will CenterPoint Energy do?

This fall and next spring, CenterPoint Energy’s authorized contractors will work on select streets in Minnetonka between Glen Lake Golf Course and Lake Rose.


There will be no assessment or cost associated with our work. Equix Integrity updates our records on the locations of sewer lines in relation to natural gas lines. In November 2023, a natural gas contractor will replace natural gas mains, replace some natural gas service lines, and move inside meters to the outside of homes. Q3 Contracting will restore the areas affected by the gas contractor’s work.


If Q3 Contracting begins restoring soft surfaces after mid-October, they plan to put down winter erosion control blankets. If they begin restoring hard surfaces after mid-November, they plan to restore with temporary asphalt. In 2024, they will return for permanent restoration.