​12/16/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, will finish construction within the scope of the 12th Avenue S. to Cedar Avenue S. construction project this week.

Due to the cold weather, crews from Q3, an authorized CenterPoint Energy contractor, will hydromulch all soft surface areas for erosion control over the winter and blacktop any needed restoration on the street and sidewalks. In the spring, crews will return onsite to complete final restoration in preparation for the City of Richfield’s Mill and Overlay project.

We understand that the 12th Avenue S. to Cedar Avenue S. construction project was an inconvenience to people living, working and commuting in and around the area, so we greatly appreciate your patience and understanding as we continue to complete all possible restoration in the 2015 construction season.

If you have questions regarding CenterPoint Energy’s restoration, please call 612-321-5042 or visit our website.

Even though CenterPoint Energy's 2015 construction season will be coming to a close at the end of the month, please continue to visit our website during the off season as 2016 projects in Richfield will be added weekly! Thank you.


12/9/2015 Update ​

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, continue replacing the remaining 50 scattered service line replacements within the scope of the 12th Avenue to Cedar Avenue construction project.

Three crews remain onsite, with each crew replacing approximately five services per day. 

Representatives from CenterPoint Energy will continue to contact the final residents whose gas service may be affected to schedule the necessary construction work on their property.

Crews anticipate completing all service line replacements within the 2015 construction season.

Due to the cold weather, crews from Q3, an authorized CenterPoint Energy contractor, will hydromulch all soft surface areas for erosion control over the winter and blacktop any needed restoration on the street. In the spring, crews will return onsite to complete final restoration ahead of the City of Richfield's road reconstruction project. For inquiries or concerns, please call our hotline number at 612-321-5042 or visit our restoration website.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you. ​



11/23/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, completed service line replacements for buildings and homes located between 13th Avenue S. to 18th Avenue S., south of Diagonal Boulevard.

Currently, 70% of the service lines within the scope of this project have been replaced. Crews continue replacing approximately five to seven service lines per day.

Representatives from CenterPoint Energy will continue to contact residents whose gas service may be affected to schedule the necessary construction work on their property.

If future weather does not permit, crews will return onsite in the spring to complete the remaining service line replacements.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you. ​​

 ​


11/10/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, completed installing natural gas distribution pipe within the scope of this project last Friday, November 6.

Currently, nine crews are scattered throughout the project replacing service lines. Crews replace approximately five to seven service lines per day and anticipate completing all service lines within the 2015 construction season.

Representatives from CenterPoint Energy will continue to contact residents whose gas service may be affected to schedule the necessary construction work on their property.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you. ​​



10/27/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, will return onsite tomorrow, Wednesday, October 28 to finish installing natural gas distribution pipe along 15th Avenue S., from 65th Street E. to Highway 62.

Early next week, crews will begin installing natural gas distribution pipe southwards along 14th Avenue S., working from Highway 62 to 66th Street E. Crews anticipate installing natural gas distribution pipe along 14th Avenue S. for one week.

Crews continue replacing service lines along 16th Avenue S., 17th Avenue S. and 18th Avenue S., south of Diagonal Boulevard. Within the next week, seven additional service crews will move onsite.


Representatives from CenterPoint Energy will continue to contact residents whose gas service may be affected to schedule the necessary construction work on their property.

Please anticipate intermittent lane closures and temporary blockage of driveways in the areas of construction. The crew onsite will work with each property owner to maintain driveway access when needed.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you. ​​



10/13/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, are currently installing natural gas distribution pipe along the east and west side of Bloomington Avenue S., between 63rd Street E. and 66th Street E.

Crews anticipate installing natural gas distribution pipe along Bloomington Avenue S. for the remainder of the week.

Crews will not be installing natural gas distribution pipe next week. Please anticipate crews to return the week of October 26.

Crews continue replacing service lines along 16th Avenue S., working southwards from Diagonal Boulevard to 76th Street E. 

Representatives from CenterPoint Energy will continue to contact residents whose gas service may be affected to schedule the necessary construction work on their property.

Please anticipate intermittent lane closures and temporary blockage of driveways in the areas of construction. The crew onsite will work with each property owner to maintain driveway access when needed.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you. ​


9/28/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, continue installing natural gas distribution pipe along 14th Avenue S., working northwards from 72nd Street E. to 66th Street E.

Within the next few days, crews will begin installing natural gas distribution pipe southwards along 13th Avenue S., from 66th Street E. to 72nd Street E.

Please anticipate crews to continue complete the final block on 15th Avenue S., from 66th Street E. to 67th Street E. by the end of the week.

Early next week, crews will begin installing natural gas distribution pipe westwards from 16th Avenue S. to 12th Avenue S., between 66th Street E. and 62nd Street E.

Crews continue replacing service lines along 17th Avenue S., working south from Diagonal Boulevard to 76th Street E.

Representatives from CenterPoint Energy will continue to contact residents whose gas service may be affected to schedule the necessary construction work on their property.

Please anticipate intermittent lane closures and temporary blockage of driveways in the areas of construction. The crew onsite will work with each property owner to maintain driveway access when needed.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you.​​



​​9/15/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, continue installing natural gas distribution pipe along 16th Avenue S., between Diagonal Boulevard and 66th Street E.

Within the next few days, crews will begin installing natural gas distribution pipe along the east and west side of Bloomington Avenue S., between Diagonal Boulevard and 66th Street E. Please anticipate crews to continue working in this area for the next four days.

Tomorrow, Wednesday, September 16, crews will begin replacing service lines along 17th Avenue S., between Diagonal Boulevard and 66th Street E.

Representatives from CenterPoint Energy will continue to contact residents whose gas service may be affected to schedule the necessary construction work on their property.

Please anticipate intermittent lane closures and temporary blockage of driveways in the areas of construction. The crew onsite will work with each property owner to maintain driveway access when needed.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you.​


9/10/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, will begin installing natural gas distribution pipe along 17th Avenue S., between Diagonal Boulevard and 66th Street E. on Monday, September 14. Crews anticipate working in this area for approximately one week.

Service line replacements are underway along 18th Avenue S., between Diagonal Boulevard and 66th Street E.

Crews are replacing approximately six service lines per day and anticipate completing 18th Avenue S. by the end of next week.

Representatives from CenterPoint Energy will continue to contact residents whose gas service may be affected to schedule the necessary construction work on their property.

Please anticipate intermittent lane closures and temporary blockage of driveways in the areas of construction. The crew onsite will work with each property owner to maintain driveway access when needed.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you.​


9/2/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, are currently installing natural gas distribution pipe along 18th Avenue S., working northwards from Diagonal Boulevard to 66th Street E. Crews anticipate working in this area for approximately one week.

Late next week, crews will begin installing natural gas distribution pipe southwards along 17th Avenue S., from 66th Street E. to Diagonal Boulevard.

Please anticipate intermittent lane closures and temporary blockage of driveways in the areas of construction. The crew onsite will work with each property owner to maintain driveway access when needed.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you.​ ​


​8/27/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, are currently installing natural gas distribution along 15th Avenue S., working northwards from76th Street E. to Diagonal Boulevard.

In a few days, crews will begin installing natural gas distribution pipe southwards along 13th Avenue S., from 72nd Street E. to 76th Street W. Crews anticipate completing 13th Avenue S. early next week.

Please anticipate intermittent lane closures and temporary blockage of driveways in the areas of construction. The crew onsite will work with each property owner to maintain driveway access when needed.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you.​

8/17/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, are currently installing natural gas distribution along 16th Avenue S., between Diagonal Boulevard and 76th Street E.

Crews will continue working along 16th Avenue S. for the remainder of the week.

Please anticipate temporary blockage of driveways in the areas of construction. The crew onsite will work with each property owner to maintain driveway access when needed.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you.​

8/10/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, will continue installing natural gas distribution at the intersections of 75th Street E. and 18th Avenue S. and 74th Street E. and 12th Avenue S. until tomorrow, Tuesday, August 11. Please anticipate restricted lanes at these intersections.

This week, crews will begin installing natural gas distribution pipe at the intersection of 18th Avenue S. and 76th Street E. and continue northwards to Diagonal Boulevard.

Crews will then install natural gas distribution pipe at the intersection of 17th Avenue S. and Diagonal Boulevard and work southwards to 76th Street E.

Please anticipate intermittent lane closures throughout the duration of the construction project.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you.​​​


8/3/2015 Update

Crews from Michels Corporation, an authorized CenterPoint Energy contractor, will begin installing natural gas distribution pipe along the north side of 75th Street E., between 18th Avenue S. and 14th Avenue S. today, Monday, August 3.  

Crews will then start installing natural gas distribution pipe along the east side of 14th Avenue S., between 75th Street E. and 74th Street E. for the remainder of the week.

Please anticipate intermittent lane closures throughout the duration of the construction project.

CenterPoint Energy’s project in Richfield is anticipated to continue until the end of the construction season.

Please visit our website often to receive project updates, traffic alerts and any anticipated road or lane closures. Thank you.​​​​​​​​​