​Northeastern Part of Minnetonka (north of Highway 7, east of I-494)


Anticipated timeline

  • Project 1: several months beginning Monday, May 8
  • Project 2: several months beginning in late June 2023 
  • If you contact CenterPoint Energy, please reference the numbers 
    • Project 1: 105215114
    • Project 2: 104293552

Overview

Equix Integrity updates our records on the locations of sewer lines in relation to natural gas lines. Michels Corporation will replace natural gas mains, replace or reconnect service lines as needed, and move inside meters to the outside of homes. Q3 Contracting will restore the areas affected by Michels Corporation’s work. 

There will be no assessment or cost associated with our work. Parking or lane closures may occur. Flaggers may be on site to help direct traffic. The crews may close some of the side streets’ entrance at Hopkins Crossroad for brief times. 


Marking utilities
CenterPoint Energy will contact Gopher State One Call 811 to locate public underground utilities such as water, sewer, and cable. You will see markings such as spray paint and utility flags. They will be color-coordinated to indicate a separate utility.

If you have installed any private lines such as sprinklers or dog fences, we ask that you mark them with whatever material is convenient for you. Examples include spray paint, flags, and wooden sticks used to stir paint. Marking sprinkler heads is sufficient.


Service line and meter work

The customer will receive a CenterPoint Energy postcard in the mail explaining the project before the natural gas crews perform the work. The crews will have CenterPoint Energy-authorized photo IDs. After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment with them.

One natural gas crew typically works on about one block per week. They will either fully replace the service line or reconnect it to the new main, depending on the line’s age. For most properties, the crews remove at least one sidewalk panel in front of the house, excavate a hole by the outside meter, and bore the service line from the sidewalk to the house.

For inside meters, the crew will make a two- to three-hour appointment at a time that works with the resident. We encourage customers to work with the crew on where they want the meter to go, keeping limitations in mind such as a minimum of three feet away from areas such as windows, doors, and vents. Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains.

The technician will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated.


Restoration

After the service line and meter work, the gas crew will backfill the excavated areas with dirt or gravel. This will be temporary before the restoration crew comes. On boulevards and lawns, they will refill the areas with black dirt, grass seed, and netting that degrades over about four months. Prior to mowing the restored area, remove any loose staples that secured the netting. For photo examples, please see our Restoration Practices page.



Project 1


For several months beginning on Monday, May 8, CenterPoint Energy’s authorized contractors will work along the following streets:

  • The cul-de-sacs of Surry Ln., Spruce Ln., Coggins Ln., Creekview Ter., Dana Dr., and Vicki Ln.
  • Stanton Drive from Atwood Drive to Plymouth Road
  • Atwood Drive from Stanton Drive to Frear Drive
  • Chase Drive from Frear Drive to McGinty Road E.
  • Frear Drive from Chase Drive to Plymouth Road
  • Half of Rutledge Circle at Plymouth Road


 CNP Map of Minnetonka Frear Dr 2023.png



Project 2

For several months beginning in the week of June 26, CenterPoint Energy’s authorized contractors will work along the following streets​:

  • Robinw​ood Terrace
  • Robinwood Spur
  • Friar Lane
  • Farm Lane
  • Royzelle Lane
  • Elmo Circle
  • Elmo Road
  • Woody Lane​


CNP Map of Minnetonka Elmo Rd.png