Minneapolis – University of Minnesota

We are committed to keeping our customers informed about important updates we are making to our infrastructure – designed to enhance safety, improve reliability, and continue to provide you with the energy you need for life's moments. The following outlines the work we plan to complete this summer near the UofM Transitway.

Overview 

For about two weeks, beginning as early as July 14, CenterPoint Energy will upgrade natural gas infrastructure along 6 Street Southeast and 23 Avenue Southeast. The work zone is shown on the map below in red and is not to scale.

113058109 UofM Transitway.png

If you are having trouble viewing the map, right click on the image and select "open image in new tab."

Contractor summary

CenterPoint works with multiple contractors to complete construction projects in a safe and timely manner. You will see these contractors working in your area and may be contacted by them at various stages in the construction process. Employees of authorized contractors will have CenterPoint​ Energy identification cards - you are encouraged to ask to see it.

Marking utilities 

CenterPoint Energy will locate public underground utilities. This is an important safety preparation, done before construction begins. The utilities will be marked with spray paint and flags. If you have installed any private lines such as sprinklers or dog fences, we ask that you mark them with a material that is convenient for you. Examples include spray paint, flags, and wooden sticks used to stir paint. Marking sprinkler heads is sufficient. If any utility flags are left in residents' yards after restoration is complete, they may be removed and thrown away.

Natural gas main work 

Plastic mains reaching the end of their useful life are replaced with modern plastic piping that increases the safety and reliability of CenterPoint's gas distribution.

Plastic main is replaced by boring underneath the side of each road. Please keep in mind that some intersections may not be permanently restored until after the service work is complete. Until then, customers may see temporary backfill such as dirt or gravel.​​

Visit the Construction Definitions page for more information.

Restoration 

The final step in an infrastructure project is to restore the roads, sidewalks, boulevards, and lawns that were impacted by construction. Restoration is typically on site a few weeks after the completion of all other construction. Until then, temporary restoration is done by the utility crews to maintain an area's livability. For more details visit the Restoration Practices page.

Traffic impacts 

Most traffic impacts will be restrictions on street parking, closure of one sidewalk at a time, and lane shifts. Specific traffic impacts will be communicated as they are determined. The utility crews will work with residents to maintain access to their homes.

Additional Resources

If you have questions, reach out to CenterPoint Energy's Communication Specialist at 612-542-6198 or una.omeara@centerpointenergy.com.

Thank you for your patience and understanding as we replace our infrastructure! We value the ​privilege of having you as a customer.