​​​​Minneapolis - Sunrise Drive

​​​Scheduled Start Date: July 2016

​​​​Project Description​​​

As a system upgrade project, Michels Corporation, an authorized CenterPoint Energy contractor, will replace approximately 4,505 feet of various diameter plastic and steel pipe with 4,732 feet of 2-inch, 3-inch and 6-inch plastic pipe along 60th Street W., Sunrise Drive and 58th Street W. 

The work will also include the replacement of approximately 57 natural gas service lines. Construction is expected to ​begin in July 2016 and will require approximately one and a half months to complete the work.  ​​​​