​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​Minneapolis - Harriet Avenue S. ​​

​​​Scheduled Start Date: Mid-November ​​2015​​​​

​​​​Project Description ​​​

As a system upgrade project, Michels Corporation, an authorized CenterPoint Energy contractor, will replace approximately 750 feet of 2-inch, 4-inch and 6-inch steel and plastic pipe with approximately 800 feet of 4-inch plastic pipe along Harriet Avenue S., between 55th Street W. and 56th Street W (see map below for detail). 

Construction is expected to begin in mid-November​ of 2015 and will require approximately three weeks to complete the work.