​​​Scheduled Start Date: The week of October 19, 2015​​​​

​​​​Project Description ​​​

As a pipeline repair project, Michels Corporation, an authorized CenterPoint Energy contractor, will replace 26 feet of 12-inch steel pipe with 28 feet of new 12-inch steel pipe near the intersection of Excelsior Boulevard and Division Street. Construction is expected to begin in October of 2015 and will require approximately one week to complete the work.

Division Street and the off ramp from Highway 7 to Division Street will be closed for the duration of the construction project. Temporary road access will be available through Arey Lane. Please anticipate a temporary signal system for three days along Excelsior Boulevard near Division Street.
​​​​