​​​Scheduled Start Date: October 20, ​2015​​​​

​​​​Project Description ​​​

As a system upgrade project, Michels Corporation, an authorized CenterPoint Energy contractor, will replace approximately 3,480 feet of various diameter steel and plastic pipe with 3,580 feet of various diameter plastic pipe along Pioneer Trail, between Cedar Forest Road and Stable Path. 

The work will also include the replacement of approximately 12 natural gas ​service lines. Construction is expected to begin in mid-October of 2015 and will require approximately one month to complete the work.