​​​​​​​​​​​​​​​​​​​Bloomington - Normandale Boulevard

​​​Scheduled Start Date: Late Summer 2016

​​​​Project Description​​​

As a system upgrade project, Michels Corporation, an authorized CenterPoint Energy contractor, will replace approximately 6,893 feet of various diameter plastic and steel pipe with 7,006 feet of 2-inch, 6-inch and 8-inch plastic pipe along Normandale Boulevard, from 94th Street W. to just north of Nine Mile Creek. 

The work will also include the replacement of approximately 10 natural gas service lines. Construction is expected to begin in the late summer of 2016 and will require approximately two months to complete the work.  ​​​​​​​​