To begin the electric service installation process, follow these simple steps:
- Determine the appropriate CenterPoint Energy electric service center based on the address of the project: Zip Code References
- Contact the service center to have a service consultant assigned to your project.
- Have the following information to share with your service consultant:
-
Site plan and elevation plan — hard copies
-
Site plan — electronic copy with XY coordinates
-
One-line diagram
-
Load analysis
-
Recorded warranty deed if easements are required
-
Specifications on modular metering enclosure if applicable