Commercial and Industrial Standard Offer Program The Commercial & Industrial (C&I) Standard Offer Program offers incentives to project sponsors who install energy efficient retrofit projects in commercial and industrial facilities. This program also accepts new construction projects which exceed minimum energy efficiency standards.  

A qualifying facility will be one with a peak demand of at least 100 kW at a single site or a combined peak demand of at least 250 kW at multiple sites. Each project must achieve a minimum summer peak demand reduction of 20 kW or 120,000kWh.

Incentives are paid to project sponsors for verified demand and energy savings. Project sponsors may be any company, contractor, or customer who installs energy efficiency measures.

For more information, please email our program contact at cisop@CenterPointEnergy.com.

Sponsor Participation Process

  • Register to participate as a project sponsor using EnerTrek
  • Use EnerTrek to develop and submit a Project Application and request funding for your project
  • Enter into a Standard Agreement with CenterPoint Energy and submit an application deposit 
  • Install proposed measures
  • Use EnerTrek to submit an Installation Report and request an initial payment
  • Use EnerTrek to submit a Savings Report and request the final payment

Incentives

  • Paid on kW and kWh reductions; vary by measure type
  • Initial Payment of 40 percent will be made after measures have been installed and inspected.
  • Final payment of up to 60 percent will be made upon approval of the Savings Report.

Measurement and Verification (M&V)

Project sponsors are responsible for conducting all project M&V.
M&V approaches can be classified according to their relative level of detail and rigor; this program involves three distinct M&V approaches:

  1. Deemed - predetermined energy savings values for particular applications
  2. Simple M&V - energy savings are based on typical equipment characteristics and some short-term testing or simple metering
  3. Full M&V - requires project-specific plan developed in accordance with International Performance Measurement and Verification Protocol

Additional  Program Information

2013 C&I Workshop Presentation

2013 CNP Lighting Tool Help Menu

2013 CNP Lighting Workbook 

2013 C&I SOP Program Manual

2013 Motor Equipment Survey

2013 Motor Equipment Template

2013 Other Measures Survey

2013 Roofing Worksheet

2013 Window Film Equipment Survey

2013 Glass Replacement

2013 CalcSmart

Rules and Requirements

Enrollment and Participation Process

Incentives

Measurement and Verification

Project Sponsors

Participating Sponsors